My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City's third party review
>
OnTrack
>
CU
>
2014
>
CU 14-3
>
City's third party review
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2015 11:19:14 AM
Creation date
4/20/2015 11:19:09 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CU
File Year
14
File Sequence Number
3
Application Name
ATT AT CROSSFIRE
Document Type
Supplemental Materials
Document_Date
4/20/2015
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Collocation. New transmission towers shall be designed to accommodate collocation of <br />additional providers: <br />2.New transmission towers of a height of at least 60 feet and no more than <br />80 feet shall be designed to accommodate collocation of a minimum of 1 <br />additional provider either outright or through future modification to the <br />tower. <br />Comment <br />:While there is sufficient vertical space for at least 1 additional array of antennas <br />on the proposed 75’ monopole, the structural capability of the proposed tower to <br />accommodate additional carriers’ facilities cannot be determined, as there was <br />no structural analysis report provided.This is critical and no tower should ever <br />be permitted without verification of the structural capability/capacity of it. <br />L.S. (Rusty) Monroe <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.