Planned Unit Development Completeness Review Form <br />Public Works Department <br /> <br />Application File Name (#): PDT15-01 Chamotee Trails PUD Date: 3/17/15 <br />Reviewed by: Deanna Smith Phone: 541-682-5714 <br /> <br /> <br />General The written statement references a private easement over the open space; please show and label this on the <br />Comments: tentative plans. <br /> <br />Wastewater Requirements <br /> <br />Submitted Missing Incomplete N/A <br />1. Show location of the existing public wastewater system and flow line <br /> <br />elevation at proposed connection point(s). <br />2. Show existing and proposed wastewater sewer layout, including service <br /> <br />to each lot (each lot must be connected to a public wastewater sewer). <br />Comments: <br />Street and Utility Improvement Requirements <br /> <br />Submitted Missing Incomplete N/A <br />3. Note on the plan proposed public improvements and whether they are to <br /> <br />be constructed publicly or privately. <br />4. Note on the plat the location, size, and species of existing and proposed <br /> <br />street trees. <br />5. Note on plat the location of any existing or proposed street lights. <br /> <br />Comments: It appears that the application includes a request to adjust the paving standards in Vivian Drive. Contact the <br />Planning Division for more information about how to file an adjustment review application. <br />Water Supply Requirements <br /> <br />Submitted Missing Incomplete N/A <br />6. Include a diagram (including diameter) of existing and proposed water <br /> <br />mains. <br />7. Show existing and proposed fire hydrants. <br /> <br />Comments: <br />Contour Intervals <br /> <br />Submitted Missing Incomplete N/A <br />8. Note on the plans the City Bench Mark used. <br /> <br /> One-foot contour intervals for ground slopes up to five percent. <br /> Two-foot contour intervals for ground slopes between five and ten percent. <br /> <br /> Five-foot contour intervals for ground slopes exceeding ten percent. <br />Ten-foot contour intervals have been provided; five foot contours are missing. <br />Comments: <br />Storm Drainage Requirements <br /> <br />Submitted Missing Incomplete N/A <br />9. Delineate the Special Flood Hazard Area. <br /> <br />10. Delineate the tops-of-banks of all open waterways on and adjacent to the <br /> property and describe extent of impacts and/or relocation work due to <br />proposed development request. <br />11. Show existing and proposed flood control facilities, including collection, <br /> conveyance, and treatment of stormwater in compliance with SW <br />Management Manual, within and adjacent to development site. <br />12. Show location of the existing piped public system and flow line elevation <br /> <br />at proposed connection point(s). <br />13. Application proposes no construction of public or private streets or shared <br /> driveways; provide a site development plan that delineates infiltration <br />rates, bedrock, groundwater elevations, and ground slopes. <br /> <br />Conditional Use Permit Completeness Review Form Revised 9/2010 Page 1 of 4 <br />