My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Application Materials
>
OnTrack
>
PDT
>
2015
>
PDT 15-1
>
Application Materials
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2015 8:40:56 AM
Creation date
2/18/2015 2:18:18 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
PDT
File Year
15
File Sequence Number
1
Application Name
CHAMOTEE TRAILS
Document Type
Application Materials
Document_Date
2/18/2015
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contour Intervals <br />Must be shown as below and must be based on City Bench Mark. The City Bench Mark used must be noted on the plans. <br /> <br />Indicate bench mark used. <br /> One-foot contour intervals for ground slopes up to five percent. <br /> Two-foot contour intervals for ground slopes between five and ten percent. <br /> Five-foot contour intervals for ground slopes exceeding ten percent. <br />Parking Area Requirements <br /> Show the location, number, and dimensions of existing and proposed parking spaces, including aisle widths and <br />disabled parking spaces. <br /> Show the location, number, and dimensions of bicycle parking spaces, including long-term and short-term bicycle <br />parking. <br /> Show traffic circulation patterns, including the width of travel lanes. <br /> Show landscaping and screening for parking areas. <br /> Show means of protection for landscaped areas (i.e. curbs). <br /> Show the location and height of all existing and proposed lighting for parking area. <br /> Show designated car pool and van pool parking for developments with 20 or more employees. <br />Street and Public Access Way Requirements <br /> Identify the number of peak hour trips based on the proposed development. If the development will generate 100 <br />or more trips during any peak hour, a Traffic Impact Analysis Review shall be required in accordance with EC 9.8650 <br />- 9.8680. <br /> Identify the street classification of all streets in accordance with EC 9.6850 and EC 9.6870. <br /> <br /> Indicate potential slope easements. <br /> Provide a street center profile using ground elevations when proposed streets intersect 15% grade. <br /> Provide the distance from centerline-to-centerline of all street intersections. <br /> Show the location and widths (right-of-way and paving width) of all existing and proposed streets, intersections, <br />and bike and pedestrian access ways, both within and adjacent to the project. <br /> Show existing and proposed curbs and sidewalks on the site and adjacent to the site. <br />www.eugene-or.gov/planning <br />Planning & Development Updated: March 2014 <br />Planning Division <br />TH <br />99 W. 10 Avenue, Eugene, OR 97401 <br />Phone: 541.682.5377 or E-mail: eugeneplanning@ci.eugene.or.usPage 5 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.