Provide a tabulation of all impervious surface areas (existing and proposed), including the amount of area covered <br />by building(s), parking, and the amount of area devoted to open space <br /> Indicate on the site plan and provide a supporting written statement addressing the solar lot standards (this applies <br />only to land zoned R-1, and R-2). <br /> Provide a cover sheet with the certification and signatures of the professional coordinator and all design team <br />members for the project. Each drawing must be stamped and signed by the licensed professional responsible for <br />preparing the plans. <br /> Show the width and location of all existing and proposed public and private easements. <br /> Show all contiguous property under the same ownership. The application shall include all contiguous undeveloped <br />or partially developed property under the same ownership. <br /> Show all proposed grading for streets, building areas, and other proposed development. <br /> Show the type and size of existing or proposed fencing and/or landscape buffering. <br /> Include a phasing plan that indicates any proposed phasing for development, including the boundaries and <br />sequencing of each phase. <br />Wastewater Requirements <br /> Show the location and flowline elevation of the existing public wastewater sewer at proposed connection point(s). <br /> Show the existing and proposed wastewater sewer layout, including service to each lot. (Each lot must be <br />connected to the public wastewater sewer.) <br />Water Supply Requirements <br /> Show a diagram (including diameter) of existing and proposed water mains. <br /> Show existing and proposed fire hydrants. <br />Storm Drainage Requirements <br /> Show the location and flow line elevation of the existing public piped system at proposed connection point(s) <br /> Delineate the tops-of-banks of all open waterways on and adjacent to the property. <br /> Delineate the Special Flood Hazard Area and the base flood elevation. <br /> A description of the extent to which a watercourse will be altered or relocated as a result of proposed <br />development, including a stormwater analysis of pre- and post-development flows. <br />www.eugene-or.gov/planning <br />Planning & Development Updated: March 2014 <br />Planning Division <br />TH <br />99 W. 10 Avenue, Eugene, OR 97401 <br />Phone: 541.682.5377 or E-mail: eugeneplanning@ci.eugene.or.usPage 3 of 7 <br />