My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Application Completeness Review
>
OnTrack
>
CU
>
2014
>
CU 14-3
>
Application Completeness Review
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2014 4:05:49 PM
Creation date
6/4/2014 12:06:57 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CU
File Year
14
File Sequence Number
3
Application Name
CINGULAR WIRELESS
Document Type
Application Completeness Review
Document_Date
5/30/2014
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment B <br />5. A statement providing the reasons for the location, design and <br />height of the proposed tower or antennas. <br />Provided <br />(7) Standards for Transmission Towers and Antennas. Installation, construction <br />or modification of all transmission towers and antennas shall comply with <br />the following standards, unless a variance is obtained pursuant to the <br />provisions of subsection (9) of this section: <br />(a) Separation Between Transmission Towers. No transmission tower <br />may be constructed within 2000 feet of any pre-existing transmission <br />tower. Tower separation shall be measured by following a straight <br />line from the portion of the base of the proposed tower which is <br />closest to the base of any pre-existing tower. For purposes of this <br />paragraph, a tower shall include any transmission tower for which the <br />city has issued a development permit, or for which an application has <br />been filed and not denied. Transmission towers constructed or <br />approved prior to February 26, 1997 may be modified to <br />accommodate additional providers consistent with provisions for <br />collocation in this section. <br />Applicant confirms no towers within 2,000 feet. <br />(b) Height Limitation: Transmission tower heights shall be governed by <br />this section except as provided for below. No transmission tower shall <br />exceed the maximum heights provided below. In no case shall a <br />variance be granted from the limitations of subparagraphs (1) through <br />(4) below. <br />5. If located within an R-1 zone, the maximum height of a <br />transmission tower, including antennas, is 75 feet, unless a <br />variance is granted pursuant to the provisions of subsection (9) <br />of this section. In no event shall a variance be granted to <br />construct such a tower in excess of 100 feet. <br />Proposed height is 75 feet. <br />(c) Collocation. New transmission towers shall be designed to <br />accommodate collocation of additional providers: <br />2. New transmission towers of a height of at least 60 feet and no <br />more than 80 feet shall be designed to accommodate collocation <br />of a minimum of 1 additional provider either outright or through <br />future modification to the tower. <br />Applicant confirms that the tower can accommodate 2 additional providers. Please provide <br />Completeness Review: New Cingular Wireless Crossfire Ministries (CU 14-3) Page 6 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.