My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Application Materials
>
OnTrack
>
CU
>
2014
>
CU 14-3
>
Application Materials
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2014 10:49:48 AM
Creation date
5/1/2014 8:24:03 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CU
File Year
14
File Sequence Number
3
Application Name
CINGULAR WIRELESS
Document Type
Application Materials
Document_Date
5/1/2014
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Written Statement of Compliance for Proposed Wireless Facility <br /> <br />Submitted to the City of Eugene <br /> <br />1. General Information <br />Applicant: New Cingular Wireless PCS, LLC <br />Todd Fiebig, Project Manager <br />nd <br />19801 SW 72Avenue <br />Tualatin, OR 97062 <br />(503) 691-5020 <br />Representative: Lexcom Development <br />Sharon Gretch, Site Development Manager <br />31649 Sexton Road <br />Philomath, OR 97370 <br />(541) 515-8263 <br />Property Owner:Calvary Chapel of Eugene, a Non-Profit Oregon Corporation <br />4060 West Amazon Drive <br />Eugene, OR 97405 <br />(541) 870-7201 <br />Project Information: <br />Site Address: 4060 West Amazon Drive <br />Parcel: 1803172100100 <br />Zone Designation: R1Low Density Residential <br />Site ID: EG46 Fox Hollow& Amazon Road <br /> <br />2. Introduction <br />Lexcom Development is submitting this application for a new wireless telecommunication <br />facility on behalf of New Cingular Wireless PCS, LLC (AT&T) and the property owner, Calvary <br />Chapel of Eugene. The purpose of the proposed project is to fill a significant coverage gap in 4G <br />LTE technology (700 MHz) and improve all AT&T service the area. The proposed facility would <br />provide indoor, outdoor, and in-vehicle coverage within a geographic area not presently served <br />by AT&T’s high band 4G LTE technology. <br />The proposed project meets all of the City of Eugene’s criteria for siting a new wireless <br />telecommunication facility, including height, setbacks and design. (AT&T requests a variance <br />from the City’s requirement for underground ancillary equipment in light of the stealth design of <br />the equipment shed.) As shown throughout this application, AT&T’s proposal is the least intrusive <br />means of meeting AT&T’s coverage objectives. The proposed project also complies with the goals <br />Site ID: EG46 Fox Hollow & Amazon RoadPage 1of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.