My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HE-16 Anne Love
>
OnTrack
>
PDT
>
2013
>
PDT 13-1
>
HE-16 Anne Love
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 4:32:40 PM
Creation date
11/27/2013 9:59:29 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
PDT
File Year
13
File Sequence Number
1
Application Name
OAKLEIGH COHOUSING
Document Type
Public Comments
Document_Date
11/27/2013
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HE-16 <br />Key Points of Concern <br />TRAFFIC <br />OMC traffic study is not applies to this area of neighborhood. With 47 parking spaces allocated, that <br />increases congestion to not only Oakleigh lane, yet to River Road. At peak times of the day, heavy flow <br />of traffic heads north and we cannot get out onto River Road due to heavy traffic stopped at West/East <br />Hilliard Rd. At times, the traffic is backed up to the bus stop in front of River RD. Second Hand Store. <br />Some of the 10 paying members of the OMC don’t own a bike to commute with. Most often, many drive <br />to their weekly/monthly meetings. Some park in our area, not on the OMC property. Since most of us <br />don’t use or have garages, Oakleigh Lane is congested now, so current cars have to pull over for another <br />car to go by. It is tricky for Garbage pickup days, local repair companies and emergency vehicles as well. <br />Members of OMC drive to their meetings on Oakleigh Lane that lives in walking distance. OMC guest <br />would park right in front of our house instead of parking in the meadow. <br />EMERGANCY VEHICHLES <br />Fire Code 507.5.1 <br />It is approximately 220 ft. from #5 &7 to the emergency vehicle turnaround. This is significance to safety <br />of residents because the truck cannot drive right up to the unit, fire hose cannot reach from the existing <br />fire hydrant on Oakleigh Lane. Buildings #2 and #7 exceed the maximum 400 ft. hose lay distance from <br />the furthest point on each building. With a number of different types of dwellings, townhouse, condo, <br />duplex, this makes it apply to a financial focus. With this number of dwellings, a new fire hydrant closer <br />to this large complex would have a better chance of putting out a large fire than sprinklers. <br />WATERLINES/ROAD IMPROVEMENTS/HOUSECOSTS <br />If OMC is required to have a new fire hydrant, that supports does not support the waterlines that are <br />currently operating. The waterlines will have to be upgraded to adequately serve this project. Many <br />neighbors on Oakleigh Lane do not want to endure thousands/ ten thousands of dollars for this project. <br />A civil engineer has told us figures are in the $220 + linear ft. for road improvements. In addition to all of <br />basic road improvements, there four people on Oakleigh Lane that have medical conditions that require <br />these people to fall under the disability act. Please make sure road improvements are covered under <br />Disability Act. <br />29.16 Accessible Spaces = The Minimum Number of Accessible Spaces <br />Total Parking in Lot = Required Minimum Number of Accessible Spaces 1-25 spaces=1 space and 26-50 <br />spaces=2spaces <br />A complex of 28 plus units will take over a year to complete. The common house is 4, 000 sq. ft. which is <br />their main focus and that could be started first. OMC is not willing to downsize the common house due <br />to it being the driving focal point. The last figures we have heard for condo cost, OMC wants to charge <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.