PT-R.8 <br />OMC is proposing Filtration Rain Gardens and Vegetated Swales for stormwater <br />destinations, and the City of Eugene has verified that the proposed facility meets <br />requirements of no facility flooding and the maximum of18 hour drawdown times. <br />Furthermore, our proposed facility meets the flow control standards requiring that the <br />post development offsite flow be less or equal topre-development flow.This has also <br />been addressed by Neil Bjorklund, the Parks and Open Space Planning Manager, in his <br />th <br />letter on record addressed July 11, 2013. <br />Sincerely, <br />Willard C. Dixon, AIA <br />OMC Project Manager <br />Principal, Willard C. Dixon Architect, LLC <br />2013 AIA-Southwestern OregonPresident <br />