My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
D-3 November 11 2013 HO Decision
>
OnTrack
>
PDT
>
2013
>
PDT 13-1
>
D-3 November 11 2013 HO Decision
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 4:32:43 PM
Creation date
11/26/2013 3:57:04 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
PDT
File Year
13
File Sequence Number
1
Application Name
OAKLEIGH COHOUSING
Document Type
Decision Document
Document_Date
11/26/2013
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
overall success of the development. Here, staff believes that the alternative of requiring <br />compliance with the setback standards is both feasible and would not jeopardize compliance <br />with any other approval criteria or applicable standards. <br /> <br /> Opponent Arguments <br /> <br />As described in prior findings, the neighbors object to the proposed wall on the western <br />boundary for many reasons. Also, the adjacent property owners have submitted statements <br />indicating they will not grant an easement to allow the applicant to avoid the required five foot <br />setback. The neighbors also state that the reduced setback on the south boundary line cannot <br />be justified merely because the adjacent property owner does not oppose the development. <br />The Hearings Official <br /> <br /> <br /> Hearings Officer Conclusions <br /> <br />the applicant notes that the reason that setbacks are proposed to be reduced in several <br />locations is to accommodate clustering of the buildings. Second, the applicant provided an <br />example site plan that shows that the five foot required setback along the western boundary is <br />not needed by shifting the buildings slightly to the east. <br /> <br />As to the proposed wall, the Hearings Officer agrees that the example site plan is sufficient <br />evidence to show that - <br />Hearings Officer incorporates the findings for EC 9.8320(3) for a full discussion of the wall along <br />the western property line. <br /> <br />As to the other reduced setbacks, the primary purpose of the PUD provisions generally is to <br />is anticipated and encouraged under EC 9.8300(1)(e). The applicant testified both orally and in <br />writing that the site design was specifically intended to cluster the residential building to <br />achieve this goal. As to the setback reductions requested for the south and east boundaries, <br />the Hearings Official finds that the proposed non-compliance facilitates clustering of the <br />residential buildings. It is also relevant that the Hearings Official previously found that the <br />applicant needs to provide sufficient screening along those boundaries under EC 9.8320(3). The <br />site plan shows sufficient space to accommodate that screening. In part for those reasons, the <br />Hearings Official concludes that the reduced setbacks do meet the purposes of EC 9.8300. <br /> <br /> Staff Findings <br /> <br />With regard to 9.2795 Solar Setback Standards, EC 9.2795(3) grants an exception to these <br />standards because the buildings abutting the north property line (Buildings 1 and 2) would <br />shade a non-developable area, namely right-of-way for Oakleigh Lane and the <br />bicycle/pedestrian access way required along the north property line. For comparative <br /> <br /> <br />Hearings Official Decision (PDT 13-1, WG 13-1) 46 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.